Architectural Stone Drawing and Cutting List Guide

Accurate drawings are essential for successful custom limestone manufacturing.

Architectural stone drawings communicate:

  • Product dimensions
  • Stone thickness
  • Surface finishes
  • Finished faces
  • Edge profiles
  • Joint widths
  • Curved geometry
  • Fixing preparation
  • Installation orientation
  • Piece references
  • Quantities
  • Project locations
  • Revision status

DMR Limestone manufactures standard and custom Turkish limestone products according to approved:

  • Architectural drawings
  • Stone shop drawings
  • Stone schedules
  • Cutting lists
  • Façade-panel schedules
  • Pool plans
  • Staircase drawings
  • Interior elevations
  • Landscape plans
  • CAD files
  • BIM exports
  • Three-dimensional models
  • Physical templates
  • Approved samples
  • Full-size mock-ups

This guide explains how to prepare clear manufacturing information for:

  • Limestone façade panels
  • Exterior wall cladding
  • Interior wall panels
  • Flooring
  • Exterior paving
  • Pool coping
  • Stair components
  • Window sills
  • Door surrounds
  • Fireplace surrounds
  • Wall caps
  • Pier caps
  • Columns
  • Capitals
  • Balustrades
  • Arches
  • Cornices
  • Curved limestone
  • Carved architectural elements
  • Custom signs
  • Cut-to-size products

Clear and coordinated drawings can help reduce:

  • Production errors
  • Site cutting
  • Material waste
  • Installation delays
  • Incorrect profiles
  • Missing pieces
  • Packaging confusion
  • Revision conflicts

Why Architectural Stone Drawings Matter

Natural stone products are often manufactured before they arrive at the construction site.

Unlike materials that can be easily adjusted on site, custom limestone may require:

  • Precision cutting
  • CNC machining
  • Curved fabrication
  • Edge profiling
  • Drilling
  • Grooving
  • Rebating
  • Anchor preparation
  • Carving
  • Hand finishing
  • Piece numbering
  • Special packaging

A missing dimension or unclear drawing note may affect:

  • Product geometry
  • Quantity
  • Surface finish
  • Installation
  • Joint alignment
  • Panel weight
  • Packing
  • Delivery programme

Manufacturing information should therefore be complete, coordinated and formally approved.

Drawing Information Required for Stone Manufacturing

Every stone drawing should clearly identify:

  • Project name
  • Project location
  • Client or contractor reference
  • Drawing title
  • Drawing number
  • Revision number
  • Revision date
  • Drawing status
  • Scale
  • Measurement units
  • Product code
  • Material name
  • Surface finish
  • Stone thickness
  • Finished dimensions
  • Finished faces
  • Edge profiles
  • Joint dimensions
  • Installation orientation
  • Quantity
  • Related drawing references
  • Approval status

Drawings should avoid relying on assumptions.

Drawing Status

Every drawing should show whether it is:

  • Preliminary
  • For coordination
  • For approval
  • Approved
  • Issued for construction
  • Issued for production
  • Superseded
  • As built

Stone should be manufactured only from clearly identified, approved production information.

“Latest drawing” is not a sufficiently precise drawing status.

Measurement Units

Drawings should clearly identify whether dimensions are:

  • Millimetres
  • Centimetres
  • Metres
  • Inches
  • Feet and inches

DMR Limestone can manufacture according to:

  • Metric dimensions
  • Approved imperial dimensions

Projects using both systems should establish one production basis.

Metric and Imperial Coordination

Mixed-unit projects create additional risk.

For example:

  • 20 mm is not exactly equal to 3/4 inch
  • 30 mm is not exactly equal to 1 1/4 inch
  • 40 mm is not exactly equal to 1 1/2 inch

The project team should confirm whether dimensions are:

  • Exact metric dimensions
  • Exact imperial dimensions
  • Converted dimensions
  • Nominal dimensions
  • Rounded dimensions

Approximate conversion should not replace an approved finished dimension.

Finished and Nominal Dimensions

Drawings should distinguish between:

  • Finished stone dimensions
  • Nominal module dimensions
  • Structural opening dimensions
  • Joint-inclusive dimensions
  • Joint-exclusive dimensions
  • Rough-cut dimensions
  • Installation dimensions

For example, a nominal 600 × 600 mm paving module may include:

  • 590 × 590 mm finished stone
  • 10 mm joints

or:

  • 600 × 600 mm finished stone
  • Additional joints

This distinction should be clearly defined.

Joint-Inclusive Dimensions

Where a drawing shows a series of pieces, it should state whether the overall dimension includes:

  • Stone only
  • Stone and joints
  • Sealant joints
  • Movement joints
  • Perimeter gaps

This is particularly important for:

  • Pool coping
  • Façade panels
  • Staircases
  • Fireplace surrounds
  • Window frames
  • Modular paving
  • Arches
  • Columns

Dimension Hierarchy

Where drawings contain conflicting dimensions, the project team should identify which information controls.

Possible hierarchy may include:

  1. Written finished dimensions
  2. Approved cutting list
  3. Detailed shop drawing
  4. Architectural drawing
  5. Drawing scale

Manufacturing should not rely on scaling from a PDF unless specifically approved.

Do Not Scale Drawings

Drawings should ideally include all required dimensions.

Scaling a drawing may create errors because of:

  • PDF resizing
  • Printing settings
  • Image distortion
  • Incorrect scale
  • Digital conversion
  • Scanning
  • Page cropping

Where a dimension is missing, it should be clarified rather than estimated.

Drawing Scale

Common scales may include:

  • 1:1 for full-size profiles
  • 1:2 for detailed components
  • 1:5 for stone details
  • 1:10 for assemblies
  • 1:20 for elevations and plans
  • 1:50 for general coordination

Even when scale is shown, critical production dimensions should be written.

Stone Material Identification

Drawings should identify the intended stone using:

  • Approved material name
  • Project material code
  • Supplier reference
  • Sample reference
  • Colour-range reference
  • Quarry or block reference where required

Avoid using only vague descriptions such as:

  • White stone
  • Beige stone
  • Natural stone
  • Light limestone

Explore:

  • Turkish Limestone
  • Limra Limestone
  • White Limestone
  • Antalya Limestone
  • Beige Limestone

Surface-Finish Identification

Every stone piece should have a clearly identified surface finish.

Possible finishes include:

  • Honed
  • Brushed
  • Sandblasted
  • Tumbled
  • Fine textured
  • Fluted
  • Grooved
  • Chiselled
  • Saw cut
  • Bush-hammered where suitable
  • Polished where suitable
  • Custom combined finish

Drawings may use project finish codes such as:

  • H1 — Fine honed
  • B1 — Light brushed
  • S1 — Fine sandblasted
  • T1 — Light tumbled
  • F1 — Narrow fluted
  • G1 — Decorative grooved

Each code should be linked to an approved physical sample.

Explore our Limestone Finishes Guide.

Finished Faces

Drawings should show which surfaces are visible and require finishing.

Finished faces may include:

  • Top face
  • Front face
  • Back face
  • Left side
  • Right side
  • Bottom edge
  • Inner curved face
  • Outer curved face
  • Return face
  • Exposed underside

A product may require different treatments on different faces.

For example, a pool coping piece may have:

  • Brushed top
  • Brushed front bullnose
  • Sawn bottom
  • Sawn back
  • Finished side edges on end pieces

Hidden and Exposed Faces

Hidden faces may still require preparation for:

  • Adhesive bonding
  • Anchors
  • Dowels
  • Kerfs
  • Rebates
  • Mechanical supports
  • Drainage

The drawing should not assume that all hidden surfaces remain rough unless this is acceptable.

Surface-Finish Direction

Some finishes have a visible direction.

Directional finishes may include:

  • Brushed surfaces
  • Saw-cut surfaces
  • Chiselled surfaces
  • Fluted panels
  • Grooved panels
  • Directional sandblasting

The direction should be shown using:

  • Arrows
  • Notes
  • Panel references
  • Elevation diagrams

Incorrect orientation may create visible inconsistency after installation.

Stone Thickness

Every product should include a finished thickness.

Possible thicknesses may include:

  • 10 mm
  • 12 mm
  • 15 mm
  • 20 mm
  • 30 mm
  • 40 mm
  • 50 mm
  • Custom greater thicknesses

The appropriate thickness depends on:

  • Product dimensions
  • Material properties
  • Support
  • Traffic
  • Fixing method
  • Wind loads
  • Edge profiles
  • Curved geometry
  • Installation
  • Handling

Thickness should not be assumed from a typical product category.

Variable Thickness

Where thickness varies, drawings should identify:

  • Minimum thickness
  • Maximum thickness
  • Taper
  • Slope
  • Profile depth
  • Remaining stone section
  • Back-side machining

This is especially important for:

  • Sloped sills
  • Wall caps
  • Rebated coping
  • Carved panels
  • Rusticated façades
  • Mitred assemblies
  • Bullnose profiles
  • Cornices

Edge Profiles

Edge profiles should be shown using:

  • Enlarged sections
  • Full-size details
  • Written dimensions
  • Radius information
  • Chamfer dimensions
  • Reference samples

Potential profiles include:

  • Straight cut
  • Eased edge
  • Pencil edge
  • Chamfer
  • Bevel
  • Half bullnose
  • Full bullnose
  • Ogee
  • Rebated edge
  • Mitred edge
  • Drop face
  • Drip groove
  • Custom moulding

Bullnose Profile Drawings

A bullnose detail should identify:

  • Radius
  • Stone thickness
  • Profile start point
  • Profile end point
  • Flat area
  • Finished faces
  • Return conditions

“Bullnose” alone may not define the required geometry.

Chamfer and Bevel Drawings

Chamfer details should identify:

  • Width
  • Depth
  • Angle
  • Finished face
  • Continuity
  • Corner treatment

For example:

  • 3 × 3 mm chamfer
  • 5 × 5 mm chamfer
  • 10 mm bevel at 45 degrees

Mitred Edge Drawings

Mitred products should show:

  • Mitre angle
  • Finished outside dimension
  • Individual component dimensions
  • Bonding faces
  • Joint location
  • Drop-face depth
  • Reinforcement where designed
  • Visible seam requirements

Mitred assemblies should not be drawn as solid stone unless they will actually be produced from solid material.

Drip-Groove Drawings

Drip grooves may be required for:

  • Window sills
  • Wall caps
  • Pier caps
  • Parapet coping
  • Exterior steps
  • Overhanging elements

The drawing should identify:

  • Groove width
  • Groove depth
  • Distance from edge
  • Groove length
  • End termination
  • Corner continuity

Rebates and Notches

Rebate drawings should identify:

  • Width
  • Depth
  • Length
  • Position
  • Remaining stone thickness
  • Internal radius
  • Finished surface
  • Installation purpose

Rebates may be used for:

  • Waterline tiles
  • Window frames
  • Door frames
  • Fixing brackets
  • Overflow channels
  • Support systems
  • Lighting
  • Drain covers

Holes and Drilling

Drilling details should identify:

  • Hole diameter
  • Hole depth
  • Through hole or blind hole
  • Centre location
  • Edge distance
  • Orientation
  • Quantity per piece
  • Tolerance
  • Intended fixing

Potential drilled features include:

  • Dowel holes
  • Anchor holes
  • Undercut holes
  • Lifting holes
  • Lighting holes
  • Plumbing penetrations
  • Sign-fixing holes

Hole Coordinates

Hole positions should be dimensioned from clear reference edges.

Avoid dimensioning holes from:

  • Uncontrolled natural edges
  • Curved profiles without reference geometry
  • Other holes only
  • Drawing scale

A coordinate datum may be useful for complex pieces.

Anchor Slots and Kerfs

Façade fixing drawings should identify:

  • Slot width
  • Slot depth
  • Slot length
  • Position
  • Edge distance
  • Orientation
  • Tolerance
  • Support or restraint function

Explore our Limestone Façade Design Guide.

CNC Stone Fabrication Files

CNC production may require:

  • DWG
  • DXF
  • STEP
  • Suitable three-dimensional formats
  • Vector artwork
  • Tool-path-ready geometry where agreed

The required file type depends on:

  • Product geometry
  • CNC machine
  • Two-dimensional cutting
  • Three-dimensional carving
  • Curved surfaces
  • Repeated patterns

Explore our CNC Stone Fabrication page.

DWG Files

DWG files should ideally include:

  • Clean geometry
  • Correct units
  • Named layers
  • Closed polylines
  • Clear dimensions
  • No duplicate lines
  • No unrelated project information
  • Clear origin point
  • Revision reference

DXF Files

DXF files are useful for:

  • Two-dimensional cutting
  • Profiles
  • Curves
  • Templates
  • Lettering outlines
  • Pool geometry
  • Custom shapes

Before sending a DXF file, confirm:

  • Units
  • Scale
  • Closed geometry
  • Line continuity
  • Radius accuracy
  • No duplicate entities

Vector Artwork

Logos, letters and decorative patterns should preferably be supplied as:

  • DWG
  • DXF
  • AI
  • EPS
  • SVG
  • Other approved vector formats

Low-resolution image files may be insufficient for precise carving.

PDF Drawings

PDF drawings are useful for:

  • Approval
  • Notes
  • Dimensions
  • Revision control
  • Markups
  • Shop-drawing review

PDF should normally accompany editable CAD information for custom production.

BIM Information

Approved BIM exports may support:

  • Panel schedules
  • Dimensions
  • Piece references
  • Quantities
  • Location codes
  • Material information
  • Installation zones

BIM data should be checked against approved two-dimensional details.

A model alone may not show:

  • Edge profiles
  • Finished faces
  • Fixing holes
  • Joint allowances
  • Manufacturing tolerances
  • Surface-finish direction

Three-Dimensional Models

Three-dimensional models may be useful for:

  • Curved façades
  • Carved panels
  • Columns
  • Capitals
  • Complex arches
  • Sculptural elements
  • Custom furniture
  • Reception desks
  • Freeform pool coping

The model should identify:

  • Units
  • Scale
  • Finished geometry
  • Stone joints
  • Individual pieces
  • Surface finish
  • Hollow or solid construction
  • Fixing preparation

Mesh and Solid Models

Where possible, solid models are generally more reliable for manufacturing than uncontrolled mesh files.

Mesh files may contain:

  • Open surfaces
  • Gaps
  • Irregular triangles
  • Incorrect scale
  • Unnecessary detail
  • Non-manufacturable geometry

The production team may need to rebuild unsuitable model geometry.

Physical Templates

Physical templates may be used for:

  • Existing buildings
  • Irregular pools
  • Curved walls
  • Replacement stone
  • Historic profiles
  • Uneven openings
  • Custom stairs

Templates should be:

  • Dimensionally stable
  • Clearly labelled
  • Full size
  • Protected from distortion
  • Marked with finished face
  • Marked with orientation
  • Marked with piece code
  • Marked with joint allowance

Suitable template materials may include:

  • Rigid plastic
  • Thin plywood
  • Stable board
  • Approved digital survey output

Flexible paper templates may distort during transport.

Site Measurements

Final site measurement may be required for:

  • Window openings
  • Door openings
  • Existing façades
  • Pool shells
  • Staircases
  • Curved walls
  • Wall caps
  • Planters
  • Replacement pieces
  • Renovations

The project team should clearly define who is responsible for:

  • Site measurement
  • Measurement accuracy
  • Survey approval
  • Joint allowances
  • Final production release

Survey Datum

Site measurements should use a clear datum.

Possible datums include:

  • Finished floor level
  • Structural grid
  • Building axis
  • Pool centre
  • Window centreline
  • Stair landing
  • Façade level
  • Survey control point

Using different datums may create cumulative errors.

Tolerances in Existing Buildings

Existing construction may contain:

  • Uneven walls
  • Out-of-square openings
  • Different sill depths
  • Variable joint widths
  • Curved walls that are not true radii
  • Stair riser variation
  • Settlement

Replacement stone should not be manufactured from one typical dimension if openings vary.

Stone Cutting Lists

A cutting list translates project drawings into individual stone pieces.

A clear cutting list may include:

  • Piece code
  • Product description
  • Length
  • Width
  • Thickness
  • Quantity
  • Material
  • Surface finish
  • Edge profiles
  • Finished faces
  • Radius
  • Holes and slots
  • Drawing reference
  • Installation area
  • Crate group
  • Notes

Cutting List Format

Cutting lists may be supplied in:

  • Excel
  • CSV
  • PDF
  • Project-specific scheduling software
  • Approved database exports

Editable spreadsheet formats are useful for:

  • Quantity review
  • Sorting
  • Filtering
  • Revision comparison
  • Packaging organisation

Unique Piece Codes

Each custom piece type should have a unique code.

Examples may include:

  • FP-001 — Façade Panel
  • WS-001 — Window Sill
  • PC-001 — Pool Coping
  • ST-001 — Stair Tread
  • FR-001 — Fireplace Jamb
  • WC-001 — Wall Cap
  • CL-001 — Column Drum

Codes should not be reused for different geometry.

Repeated Pieces

Repeated pieces may share one product code when they have identical:

  • Dimensions
  • Thickness
  • Finish
  • Edge profiles
  • Holes
  • Orientation
  • Material

The cutting list should clearly identify the total quantity.

Mirrored Pieces

Left-hand and right-hand pieces should have separate codes when geometry is mirrored.

Examples include:

  • Window jambs
  • Fireplace jambs
  • Stair winders
  • Corner pieces
  • Entrance surrounds
  • Curved transitions

Avoid assuming that installers can reverse a finished piece.

Finished Orientation

Piece orientation may include:

  • Top
  • Bottom
  • Left
  • Right
  • Interior
  • Exterior
  • Front
  • Back
  • Up
  • Down
  • Clockwise
  • Counter-clockwise

Orientation should be shown where the piece is not symmetrical.

Stone Panel Schedules

A façade-panel schedule may include:

  • Panel code
  • Building
  • Elevation
  • Floor
  • Grid reference
  • Length
  • Width
  • Thickness
  • Finish
  • Edge details
  • Anchor preparation
  • Quantity
  • Weight
  • Crate number

Façade Elevation Drawings

Façade elevations should show:

  • Panel layout
  • Panel references
  • Joint widths
  • Grid lines
  • Floor levels
  • Window openings
  • Door openings
  • Corners
  • Movement joints
  • Parapets
  • Soffits
  • Installation sequence

Façade Panel Details

Each panel detail should identify:

  • Finished dimensions
  • Thickness
  • Material orientation
  • Surface finish
  • Finished faces
  • Anchor slots
  • Hole positions
  • Edge distances
  • Returns
  • Mitres
  • Weight where required

Façade Corner Drawings

Corner drawings should clearly show whether the solution is:

  • Mitred
  • Solid
  • Bonded L-shaped
  • Alternating quoin
  • Open joint
  • Metal trim
  • Return panel

The drawing should identify:

  • Outside dimensions
  • Individual component dimensions
  • Joint position
  • Visible seam
  • Anchor preparation
  • Packaging orientation

Window-Surround Drawings

Window details may include:

  • Sill
  • Left jamb
  • Right jamb
  • Head
  • Architrave
  • Keystones
  • Returns

The drawing should coordinate:

  • Window frame
  • Structural opening
  • Insulation
  • Waterproofing
  • Flashing
  • Sealant joints
  • Drip grooves
  • Surface falls

Window-Sill Drawings

Sill drawings should identify:

  • Overall length
  • Overall depth
  • Front overhang
  • Side horns
  • Stone thickness
  • Surface fall
  • Drip groove
  • Side returns
  • Rebates
  • Finished faces
  • Joint locations

Door-Surround Drawings

Door and entrance drawings may include:

  • Jambs
  • Header
  • Threshold
  • Arch
  • Columns
  • Cornice
  • Carved elements

Heavy components may require separate structural support details.

Limestone Pool Coping Drawings

Pool-coping drawings should identify:

  • Pool reference
  • Piece number
  • Inner radius
  • Outer radius
  • Arc angle
  • Chord length
  • Coping width
  • Thickness
  • Edge profile
  • Surface finish
  • Joint width
  • Drop-face depth
  • Installation direction

Explore our Pool Coping and Paving Guide.

Pool Plan Requirements

Pool plans should show:

  • Overall dimensions
  • Straight sections
  • Curved sections
  • Radius centres
  • Steps
  • Skimmers
  • Overflow channels
  • Waterline tile
  • Coping joints
  • Movement joints
  • Special transitions
  • Drain locations

Curved Pool Geometry

For curved coping, provide:

  • Inner radius
  • Outer radius
  • Tangent points
  • Curve centre
  • Arc length or angle
  • Segment quantity
  • Joint width
  • Start and end references

Providing only a visual curve without numerical geometry is insufficient for precision production.

Freeform Pool Drawings

Freeform pools may require:

  • CAD survey
  • Three-dimensional survey
  • Full-size templates
  • Coordinate points
  • Segment-by-segment drawings
  • Site verification

Drop-Face Coping Drawings

Drop-face details should identify:

  • Top width
  • Top thickness
  • Front-face depth
  • Mitred or solid construction
  • Bonded joint
  • Inner edge profile
  • Outer edge profile
  • Curved geometry
  • Corner details
  • Finished faces

Infinity-Pool Drawings

Infinity and overflow details should coordinate:

  • Overflow level
  • Coping level
  • Water edge
  • Channel dimensions
  • Rebate
  • Grate
  • Waterproofing
  • Tile
  • Finished stone level

Small dimensional differences may affect overflow performance.

Limestone Stair Drawings

Stair drawings should identify:

  • Total stair width
  • Tread depth
  • Riser height
  • Tread thickness
  • Riser thickness
  • Nosing profile
  • Nosing projection
  • Joint positions
  • Landings
  • Winder steps
  • Finished floor levels
  • Surface finish
  • Anti-slip grooves

Stair Piece Codes

Each step may be coded by:

  • Staircase
  • Floor
  • Flight
  • Step number
  • Left or right orientation

Examples:

  • ST-A-F1-01
  • ST-A-F1-02
  • ST-B-W01-L
  • ST-B-W01-R

Tread and Riser Coordination

Drawings should show whether:

  • The tread overlaps the riser
  • The riser sits beneath the tread
  • The nosing is solid
  • The nosing is mitred
  • The joint is visible
  • The riser is recessed
  • The tread includes grooves

Winder Stair Drawings

Winder steps require:

  • Inner width
  • Outer width
  • Angle
  • Centreline
  • Nosing curve
  • Joint positions
  • Left or right orientation
  • Template where required

Curved Stair Drawings

Curved stairs may require:

  • Inner radius
  • Outer radius
  • Riser angle
  • Step angle
  • Tread width
  • Nosing geometry
  • Vertical rise
  • Three-dimensional model

Fireplace Drawings

Fireplace drawings should identify:

  • Opening width
  • Opening height
  • Jamb dimensions
  • Header dimensions
  • Mantel shelf
  • Hearth
  • Corbels
  • Frieze
  • Overmantel
  • Wall build-up
  • Finished faces
  • Joint positions
  • Appliance clearances

Fireplace Component Codes

Components may include:

  • Left jamb
  • Right jamb
  • Header
  • Mantel
  • Hearth
  • Left corbel
  • Right corbel
  • Frieze
  • Overmantel

Each component should have a separate reference.

Wall-Cap Drawings

Wall-cap drawings should include:

  • Wall width
  • Cap width
  • Stone thickness
  • Overhang
  • Surface slope
  • Drip grooves
  • Joint width
  • Corner pieces
  • End pieces
  • Curved sections

Pier-Cap Drawings

Pier-cap details may include:

  • Pier dimensions
  • Cap dimensions
  • Pyramid height
  • Hip geometry
  • Overhang
  • Drip groove
  • Lighting hole
  • Cable route
  • Fixing detail

Column Drawings

Column drawings should identify:

  • Total height
  • Shaft diameter
  • Shaft width
  • Taper
  • Number of drums
  • Drum heights
  • Flute dimensions
  • Base profile
  • Capital profile
  • Joint positions
  • Structural core
  • Fixing
  • Orientation

Column Drum Drawings

Each drum should include:

  • Piece code
  • Height
  • Diameter
  • Internal hole where required
  • Dowel holes
  • Orientation
  • Flute alignment
  • Joint profile

Fluted Column Drawings

Fluted columns require:

  • Number of flutes
  • Flute width
  • Flute depth
  • Flute radius
  • Arris width
  • Start and stop positions
  • Alignment across drums

Capital Drawings

Capital production may require:

  • Front elevation
  • Side elevation
  • Plan
  • Section
  • Three-dimensional model
  • Carving details
  • Overall dimensions
  • Column interface
  • Top support dimensions
  • Orientation

Balustrade Drawings

Balustrade drawings should identify:

  • Baluster height
  • Baluster profile
  • Baluster spacing
  • Top rail
  • Bottom rail
  • Newel posts
  • Curved sections
  • Stair angle
  • Fixing holes
  • Joint positions

The complete balustrade system should be structurally designed by qualified project professionals.

Arch Drawings

Arch drawings should identify:

  • Opening width
  • Opening height
  • Inner radius
  • Outer radius
  • Arch type
  • Voussoir quantity
  • Joint width
  • Keystone
  • Arch depth
  • Finished faces
  • Support conditions

Arch Types

Possible arch forms include:

  • Semicircular
  • Segmental
  • Pointed
  • Elliptical
  • Three-centred
  • Flat arch
  • Custom geometry

Voussoir Drawings

Each arch segment may require:

  • Inner arc length
  • Outer arc length
  • Angle
  • Depth
  • Thickness
  • Joint faces
  • Piece number
  • Orientation

Keystone Drawings

Keystones may be:

  • Plain
  • Projecting
  • Carved
  • Oversized
  • Integrated into a decorative surround

Dimensions should include:

  • Top width
  • Bottom width
  • Height
  • Projection
  • Depth
  • Carving
  • Joint faces

Cornice and Moulding Drawings

Profiled stone should include:

  • Full-size section
  • Profile dimensions
  • Projection
  • Height
  • Stone depth
  • Joint positions
  • Internal and external corners
  • End returns
  • Surface finish

Profile Continuity

Long mouldings may be produced in sections.

The drawing should coordinate:

  • Joint locations
  • Pattern continuity
  • Internal corners
  • External corners
  • Returns
  • Terminations
  • Piece lengths

Fluted and Grooved Panel Drawings

Fluted or grooved panels should identify:

  • Panel dimensions
  • Thickness
  • Groove width
  • Groove depth
  • Spacing
  • Edge margins
  • Pattern direction
  • Pattern start point
  • Pattern end point
  • Joint position
  • Corner treatment

Pattern Continuity

Pattern continuity should be checked across:

  • Adjacent panels
  • Corners
  • Doors
  • Windows
  • Columns
  • Curved surfaces
  • Ceiling transitions

Carved Stone Drawings

Carved elements may require:

  • Vector artwork
  • Relief depths
  • Section details
  • Three-dimensional model
  • Surface-finish notes
  • Edge margins
  • Lettering style
  • Orientation
  • Fixing information

Explore our Architectural Stone Carving page.

Lettering and Sign Drawings

Lettering details should identify:

  • Font
  • Letter height
  • Letter depth
  • Letter spacing
  • Alignment
  • Recessed or raised form
  • Paint or metal insert
  • Panel dimensions
  • Edge margins
  • Fixing holes

Fonts should be supplied as vector outlines where possible.

Arabic Calligraphy Drawings

Arabic calligraphy projects should use approved artwork showing:

  • Exact letter forms
  • Diacritics
  • Line spacing
  • Reading direction
  • Relief depth
  • Panel layout
  • Joint positions

The approved artwork should be reviewed by the responsible client or design team before production.

Curved Limestone Drawings

Curved stone may require:

  • Inner radius
  • Outer radius
  • Arc angle
  • Chord length
  • Segment length
  • Thickness
  • Joint width
  • Surface finish
  • Edge profiles
  • Installation orientation

Explore our Curved Limestone Fabrication page.

True Radius and Irregular Curves

Drawings should distinguish between:

  • True circular radius
  • Ellipse
  • Spline
  • Freeform curve
  • Site-measured irregular curve

A simple radius dimension should not be applied to a non-circular curve.

Coordinate-Based Geometry

Complex curves may be defined using:

  • X and Y coordinates
  • X, Y and Z coordinates
  • Control points
  • Centre points
  • Tangent points
  • Digital models

Curved Wall Panels

Curved wall-panel drawings should identify whether the stone is:

  • Solid curved
  • Faceted
  • Kerf cut
  • Bonded
  • Segmented
  • Back-cut
  • Thin cladding over a curved substrate

Paving Drawings

Paving plans should identify:

  • Paver sizes
  • Pattern
  • Joint width
  • Borders
  • Drain locations
  • Surface falls
  • Movement joints
  • Stairs
  • Thresholds
  • Pool edges
  • Planters
  • Installation zones

Modular Pattern Drawings

Modular paving should include:

  • Exact piece sizes
  • Joint widths
  • Repeating module
  • Quantity ratio
  • Installation diagram
  • Border pieces

Random-Length Paving Drawings

Random-length specifications should define:

  • Fixed width
  • Minimum length
  • Maximum length
  • Joint width
  • Quantity calculation
  • End-joint rules

Interior Flooring Drawings

Interior floor plans should coordinate:

  • Room centres
  • Main axes
  • Door thresholds
  • Borders
  • Feature patterns
  • Movement joints
  • Stair connections
  • Floor outlets
  • Built-in furniture
  • Directional stone layout

Dry-Layout Drawings

Dry-layout drawings may show:

  • Piece numbers
  • Room positions
  • Panel sequence
  • Colour distribution
  • Fossil distribution
  • Pattern continuity
  • Joint locations

Slab Layout Drawings

Projects using slabs may require:

  • Slab references
  • Cut-piece nesting
  • Vein or fossil direction
  • Book-matching concepts
  • Waste allowances
  • Finished-piece references

Material Orientation

Some stone may show different appearance or performance depending on cutting orientation.

The project may specify:

  • Vein cut
  • Cross cut
  • Bed face
  • Edge face
  • Custom orientation

Orientation should be consistent across related components.

Dimensional Tolerances

Drawings should identify required tolerances for:

  • Length
  • Width
  • Thickness
  • Squareness
  • Flatness
  • Edge straightness
  • Hole diameter
  • Hole location
  • Slot dimensions
  • Radius
  • Profile geometry

Required tolerances should be realistic for:

  • Natural stone
  • Product dimensions
  • Surface finish
  • Production method
  • Installation system

Tight Tolerances

Tighter tolerances may affect:

  • Material selection
  • Production time
  • Inspection frequency
  • Waste
  • Cost
  • Packaging
  • Installation

The project team should request only the tolerances necessary for performance and design.

Natural Edge and Tumbled Products

Products with tumbled or hand-finished edges may require different tolerance expectations from precision-cut honed panels.

Visual criteria should be supported by physical samples.

Quantity Information

Quantities should be provided by:

  • Piece
  • Square metre
  • Square foot
  • Linear metre
  • Linear foot
  • Cubic metre
  • Set
  • Modular package

Custom architectural products should usually include piece quantities.

Waste and Spare Material

The project quantity should consider:

  • Cutting waste
  • Selection
  • Breakage
  • Site cuts
  • Pattern
  • Curves
  • Corners
  • Future replacement

Spare quantities should be identified separately.

Revision Control

Revision control is essential for stone manufacturing.

Every drawing should show:

  • Revision number
  • Revision date
  • Description of change
  • Approval status
  • Issued-by information
  • Superseded drawing reference

Revision Register

Large projects should maintain a register containing:

  • Drawing number
  • Drawing title
  • Current revision
  • Date received
  • Approval status
  • Production status
  • Affected pieces
  • Comments

Clouded Revisions

Changed areas should be clearly identified using:

  • Revision clouds
  • Change notes
  • Marked dimensions
  • Updated schedules

A new revision should not rely only on the reviewer visually discovering changes.

Late Revisions

Late changes may affect:

  • Stone already cut
  • CNC machining
  • Holes and slots
  • Surface finish
  • Piece numbering
  • Packaging
  • Cost
  • Programme
  • Delivery

The project team should immediately identify whether changed pieces are:

  • Not started
  • In production
  • Completed
  • Packed
  • Shipped
  • Installed

Superseded Drawings

Superseded drawings should be:

  • Clearly marked
  • Removed from production use
  • Archived
  • Linked to the replacement revision

Production teams should not have uncontrolled access to several unmarked revisions.

Drawing Approval

Approval may be provided by:

  • Architect
  • Main contractor
  • Façade consultant
  • Interior designer
  • Pool consultant
  • Stone contractor
  • Client representative

The responsible approval authority should be identified at the start of the project.

Approval Comments

Comments should be resolved clearly.

Avoid ambiguous responses such as:

  • Approved with comments
  • Proceed as discussed
  • Generally acceptable
  • Adjust on site

Where a comment affects dimensions or geometry, a revised drawing should be issued.

Red-Line Markups

Red-line markups may be used during coordination, but final production should be based on a clean revised drawing.

Drawing Transmittals

Each document issue should include:

  • Project name
  • Transmittal number
  • Date
  • Drawing list
  • Revisions
  • Purpose of issue
  • Required response
  • Sender
  • Recipient

File Naming

A consistent file-naming system may include:

  • Project
  • Drawing type
  • Product type
  • Drawing number
  • Revision
  • Date

Example:

DMR-VILLA01-POOL-COPING-PC001-REV03.pdf

Avoid generic names such as:

  • Final.pdf
  • Final2.pdf
  • Latest.dwg
  • New drawing.pdf
  • Correct version.dxf

Layer Naming in CAD Files

CAD layers may be organised by:

  • Stone outline
  • Dimensions
  • Text
  • Fixing holes
  • Grooves
  • Finished faces
  • Hidden geometry
  • Centre lines
  • Reference construction
  • Cutting path

Unused or unrelated layers should be removed before issue.

CAD Geometry Quality

Before sending CAD files, check for:

  • Duplicate lines
  • Open polylines
  • Overlapping geometry
  • Tiny gaps
  • Unnecessary hatches
  • Unexploded blocks
  • Incorrect scale
  • Unclear origins
  • Hidden geometry
  • Multiple alternatives in one file

Manufacturing Feasibility Review

Before approval, drawings should be reviewed for:

  • Block availability
  • Slab dimensions
  • Product weight
  • Minimum remaining thickness
  • Edge fragility
  • Tool access
  • Internal corner radius
  • Drill depth
  • Profile depth
  • Packaging
  • Site handling
  • Installation

A geometrically possible drawing may still be impractical to manufacture, transport or install.

Internal Corners

CNC tools may create minimum internal radii.

Perfectly sharp internal corners may require:

  • Hand finishing
  • Split components
  • Different geometry
  • Additional cost

The drawing should identify whether a small internal radius is acceptable.

Minimum Stone Sections

Deep grooves, holes or profiles may leave insufficient stone thickness.

The manufacturing and engineering review should consider:

  • Remaining section
  • Edge distance
  • Handling
  • Impact
  • Fixing
  • Long-term exposure

Maximum Piece Dimensions

Maximum practical dimensions depend on:

  • Block size
  • Slab size
  • Stone structure
  • Thickness
  • Weight
  • Profile
  • Handling
  • Packaging
  • Transport
  • Site access

Large pieces may need to be divided into smaller sections.

Joint Position Optimisation

Where a large element must be divided, joint positions should consider:

  • Architectural symmetry
  • Structural support
  • Pattern continuity
  • Handling
  • Installation
  • Replacement
  • Water drainage

Piece Weight

Drawings may need to identify approximate or confirmed weight for:

  • Façade panels
  • Columns
  • Capitals
  • Fireplace mantels
  • Large stairs
  • Solid coping
  • Benches
  • Sculptural elements

Weight affects:

  • Lifting
  • Packaging
  • support
  • installation
  • crane selection
  • manual handling

Packaging Information on Drawings

Drawings or schedules may identify packaging groups by:

  • Building
  • Villa
  • Elevation
  • Floor
  • Room
  • Pool
  • Staircase
  • Fireplace
  • Landscape area
  • Installation sequence

Piece Numbering

Piece numbers may be shown on:

  • Stone labels
  • Crate labels
  • Packing lists
  • Shop drawings
  • Dry-layout plans
  • Installation diagrams

Piece-number locations should avoid visible permanent marks.

Crate References

A packing schedule may link each piece to:

  • Crate number
  • Project zone
  • Gross weight
  • Net weight
  • Installation sequence
  • Handling requirements

Drawing Coordination with Packaging

Long or fragile pieces may require:

  • Vertical packing
  • Custom supports
  • Smaller crate groups
  • Edge protection
  • Separate shipping

Packaging limitations may affect piece dimensions.

Drawing Coordination with Site Access

Before approving large pieces, confirm:

  • Road access
  • Container access
  • crane capacity
  • forklift capacity
  • loading bay
  • lift dimensions
  • door widths
  • corridor dimensions
  • scaffold access
  • storage space

Mock-Up Drawings

Mock-up drawings should identify:

  • Included products
  • Material
  • Finish
  • Joint widths
  • Fixings
  • Adjacent materials
  • Grout
  • Sealants
  • Dimensions
  • Approval criteria

Full-Size Profile Samples

Full-size profile drawings may be required for:

  • Bullnose coping
  • Cornices
  • Stair nosings
  • Window sills
  • Wall caps
  • Fireplace mouldings
  • Custom rails

A 1:1 printed profile may support physical approval.

Approved Samples and Drawings

Drawings should reference approved:

  • Material sample
  • Colour range
  • Surface finish
  • Edge profile
  • Mock-up
  • Sealer sample

Drawings and samples should not conflict.

Quality-Control Drawings

Production inspection may use:

  • Dimensioned drawings
  • Profile templates
  • Hole-coordinate sheets
  • Panel schedules
  • Radius templates
  • Approved samples
  • Piece-number lists

Pre-Shipment Drawing Review

Before shipment, the project team may review:

  • Piece quantities
  • Product codes
  • Crate assignments
  • Replacement pieces
  • Drawings
  • Packing lists
  • Installation sequence

As-Built Drawings

As-built information may record:

  • Final piece dimensions
  • Approved site changes
  • Replacement pieces
  • Final panel codes
  • Installation locations
  • Crate records
  • Spare material

As-built documents can support future maintenance and replacement.

Common Stone Drawing Mistakes

Missing Units

A dimension without units may be misinterpreted.

Missing Thickness

Plan dimensions do not define stone thickness.

Using Nominal Dimensions Without Explanation

Nominal modules may not equal finished stone dimensions.

Missing Joint Widths

Overall assemblies cannot be accurately calculated without joint information.

Missing Finished Faces

The wrong faces may remain sawn or unfinished.

Writing “Bullnose” Without a Radius

Different suppliers may interpret bullnose differently.

Missing Left and Right References

Mirrored pieces may be manufactured incorrectly.

Sending Only a PDF for Complex CNC Work

Editable geometry may be required.

Sending Low-Resolution Logos

Raster images may not be suitable for precise carving.

Using Different Revisions of Plans and Cutting Lists

Quantities and dimensions may conflict.

Scaling from Drawings

PDF or print scaling may be inaccurate.

Producing Curved Stone from Approximate Geometry

Small radius errors may create large installation problems.

Missing Installation Orientation

Directional finishes and profiles may face the wrong direction.

Ignoring Packaging and Handling

A piece may be manufacturable but impossible to deliver or install.

Architectural Stone Drawing Checklist

Before issuing drawings for production, confirm:

  • Project name
  • Drawing number
  • Revision
  • Date
  • Approval status
  • Measurement units
  • Scale
  • Material
  • Colour-range reference
  • Surface finish
  • Finish direction
  • Finished faces
  • Length
  • Width
  • Thickness
  • Edge profiles
  • Joint widths
  • Radii
  • Angles
  • Holes
  • Slots
  • Rebates
  • Grooves
  • Piece codes
  • Quantities
  • Installation orientation
  • Packaging zone
  • Related drawings
  • Mock-up reference
  • Site measurement approval

Cutting List Checklist

Confirm that the cutting list includes:

  • Unique piece code
  • Product description
  • Length
  • Width
  • Thickness
  • Quantity
  • Material
  • Finish
  • Finished faces
  • Edge profiles
  • Radius
  • Holes and slots
  • Drawing reference
  • Project area
  • Crate group
  • Revision

Information Required for Drawing Review

To request a stone drawing and manufacturing review, provide:

  • Project name
  • Project country and city
  • Product type
  • Limestone preference
  • Architectural drawings
  • Stone drawings
  • Cutting lists
  • CAD files
  • BIM exports
  • Three-dimensional models
  • Dimensions
  • Thickness
  • Surface finish
  • Edge profiles
  • Joint widths
  • Required tolerances
  • Quantities
  • Installation method
  • Project programme
  • Delivery destination

Frequently Asked Questions About Architectural Stone Drawings

What drawings are required for custom limestone production?

Required documents may include plans, elevations, sections, details, stone schedules, cutting lists and approved CAD files.

Can DMR Limestone work from architectural drawings?

Yes. Architectural drawings may be used for preliminary review, but detailed manufacturing information may also be required.

Can DMR Limestone prepare stone shop drawings?

Drawing coordination may be provided according to the agreed project scope.

Who approves the final shop drawings?

Final approval should be provided by the responsible architect, contractor, consultant or client representative.

Can production begin from preliminary drawings?

Production should begin only from approved information issued for manufacturing.

Can DMR Limestone work from PDF files?

Yes, but editable CAD geometry may be required for custom cutting and CNC production.

Can DMR Limestone work from DWG files?

Yes. Clean, correctly scaled DWG files are preferred for many custom projects.

Can DMR Limestone work from DXF files?

Yes. DXF files are useful for profiles, curves, templates and cutting geometry.

Can BIM models be used?

Approved BIM exports may support panel schedules and dimensional coordination.

Can DMR Limestone work from three-dimensional models?

Yes. Three-dimensional models may support curved and carved products.

Can a photograph be used for production?

A photograph may support design interpretation, but accurate dimensions and approved geometry are required.

Can limestone be manufactured from a hand sketch?

A clear sketch may support preliminary discussion, but formal production drawings may be required.

Can physical templates be used?

Yes. Full-size stable templates may be used for irregular or existing conditions.

Which measurement units should be used?

Use clearly identified metric or imperial dimensions.

Can metric and imperial dimensions be mixed?

It is better to establish one approved production basis.

Should dimensions include joints?

The drawing must clearly state whether dimensions include or exclude joints.

What is a finished dimension?

It is the final required size of the manufactured stone piece.

What is a nominal dimension?

It is a module or descriptive size that may differ from the finished stone dimension.

Can DMR Limestone scale dimensions from a PDF?

Critical production dimensions should be written rather than scaled.

Why is stone thickness important?

Thickness affects weight, strength, profiles, fixing, packaging and installation.

Can thickness vary within one piece?

Yes, where slopes, profiles or rebates are required, but the geometry must be fully defined.

How should finished faces be shown?

Use elevations, sections, arrows, labels or surface codes.

How should edge profiles be shown?

Use enlarged dimensioned sections and approved profile references.

Is “bullnose” enough information?

No. The radius and complete profile should be defined.

Can custom edge profiles be manufactured?

Yes. Approved drawings or full-size templates are required.

Can drip grooves be added?

Yes. Width, depth and position should be shown.

Can rebates and notches be produced?

Yes. Their complete dimensions and purpose should be identified.

Can holes be drilled at the factory?

Yes. Hole diameter, depth, position and tolerance must be provided.

Can façade anchor slots be machined?

Yes. Approved fixing-preparation drawings are required.

Does DMR Limestone design façade anchors?

No. Fixing systems should be designed by qualified project professionals.

Can curved limestone be manufactured from one radius?

Yes, for true circular geometry where all required dimensions are provided.

What is required for irregular curves?

Accurate CAD geometry, coordinates, scans or physical templates may be required.

Can freeform pool coping be manufactured?

Yes. Site survey or full-size templates may be needed.

Should curved coping pieces be numbered?

Yes. Numbering helps maintain the approved installation sequence.

Can pool coping be produced from a pool plan?

Yes. The plan should identify inner and outer geometry, profiles, joints and special pieces.

Should final pool dimensions be verified?

Yes, particularly for curved, overflow and renovation pools.

What information is required for staircase production?

Provide tread depths, riser heights, widths, nosings, joints, landings and finished levels.

Can winder stairs be produced?

Yes. Detailed geometry or templates may be required.

Can curved staircases be manufactured?

Yes. Three-dimensional coordination may be necessary.

Can fireplace components be produced from an elevation?

A plan, elevation, sections and component dimensions are normally recommended.

Can columns be produced from architectural drawings?

Yes. Shaft, base, capital, joints and structural coordination should be defined.

Can capitals be produced from photographs?

Photographs may provide design direction, but accurate drawings or models are required.

Can arches be manufactured?

Yes. Opening dimensions, radii, arch type, segment quantity and joints must be defined.

Can logos be engraved?

Yes. Vector artwork is preferred.

Can low-resolution JPG logos be used?

They may be insufficient for precise manufacturing.

Can Arabic calligraphy be carved?

Yes. Approved vector artwork and final linguistic review are required.

Can fluted panels align across several pieces?

Yes. Pattern continuity should be defined in the elevation and piece drawings.

Can flutes continue around corners?

Yes, but the corner treatment must be clearly designed.

Can directional finishes be controlled?

Yes. Finish direction should be shown on drawings and labels.

What is a stone cutting list?

It is a schedule of individual pieces containing dimensions, quantities, finishes and fabrication details.

Can cutting lists be supplied in Excel?

Yes. Editable spreadsheet formats are useful for project coordination.

Does each piece need a unique code?

Each unique geometry should have a unique code.

Can identical pieces share one code?

Yes, when all dimensions and fabrication details are identical.

Should mirrored pieces have different codes?

Yes. Left and right pieces should be clearly separated.

Can pieces be numbered by room or elevation?

Yes. Piece numbering may follow the installation location.

Can crates be linked to piece numbers?

Yes. Packing lists may show the crate for every item.

Why is revision control important?

Stone may already be in production when a revision is issued.

What should a revision contain?

It should identify changed dimensions, quantities, geometry and the superseded version.

Can production use drawings marked “approved with comments”?

Comments affecting production should be incorporated into a clean revised drawing.

What happens when drawings change after cutting?

Changes may create additional cost, replacement production and programme delays.

Can on-site changes be made to stone?

Minor modifications may be possible, but uncontrolled cutting can affect appearance, strength and fixings.

Can DMR Limestone review manufacturing feasibility?

Yes. Drawings may be reviewed for stone dimensions, machining, profiles, packaging and production limitations.

Is every drawn shape manufacturable?

No. Tool access, stone strength, block dimensions and remaining sections may require changes.

Can sharp internal corners be machined?

CNC tools usually create a minimum internal radius. Hand finishing or split components may be required.

Can very large pieces be manufactured?

Maximum dimensions depend on material, thickness, weight, handling, packaging and site access.

Can large pieces be divided?

Yes. Joint locations should be coordinated with the design.

Should piece weight be shown?

It is recommended for large, heavy or mechanically fixed elements.

Can stone be packed by floor or area?

Yes. Drawings and schedules may define packaging zones.

Can stone be packed in installation order?

Yes, where the sequence is agreed before packaging.

Can DMR Limestone provide as-built records?

Project-specific manufacturing and piece records may be coordinated within the agreed scope.

What file names should be used?

Use clear project, drawing, product and revision references.

Should files be named “final”?

No. Use formal revision numbers and dates.

Can drawings be submitted in several languages?

Yes, but dimensions and technical terms should remain clear and consistent.

What information is needed for a drawing quotation?

Provide project type, drawings, product list, quantity, complexity, material and required drawing scope.

Request an Architectural Stone Drawing Review

Contact DMR Limestone to request:

  • Stone drawing review
  • Cutting-list review
  • Limestone fabrication assessment
  • DWG and DXF coordination
  • CNC geometry review
  • Façade-panel schedule review
  • Pool-coping drawing review
  • Stair drawing review
  • Window-sill drawing review
  • Fireplace component review
  • Column and capital review
  • Arch and cornice review
  • Curved limestone review
  • Carved stone review
  • Piece-numbering coordination
  • Project-area packaging
  • Custom limestone quotation

Send us your architectural drawings, stone schedules, cutting lists, CAD files, product dimensions, thicknesses, surface finishes, edge profiles, quantities, project location and delivery destination to receive a project-specific limestone manufacturing review and quotation.